Do you only want to retrofit the roller blind, or the complete double casement window. In new construction, the installation of a double casement window takes about 2 hours with 2 people. Roller blind maybe another 1 hour with 2 people. I paid about €50 (x6) for the double casement window installation, but I also helped myself and got the material. Roller blind at roto and Velux is basically plug & play. Since we have new construction, I went straight for electric (solar costs €100 more, but the cable for electricity including switch also costs about €100)