Hello everyone,
I would be interested to know if the calculation for a soil replacement (filled soil) is realistic:
Facts: 8.7 m * 9.7 m * 0.9 m = 76 cubic meters * 2.25 = 171 tons soil replacement with mineral mixture 0/32
Cost mineral mixture: 171 tons * 28.15 EUR including installation and compaction = 4,813 EUR
Cost soil excavation: 76 cubic meters * 25 EUR = 1,900 EUR
Is this calculation realistic?
The excavated soil will be used on the property to level out unevenness.
Thank you!
I would be interested to know if the calculation for a soil replacement (filled soil) is realistic:
Facts: 8.7 m * 9.7 m * 0.9 m = 76 cubic meters * 2.25 = 171 tons soil replacement with mineral mixture 0/32
Cost mineral mixture: 171 tons * 28.15 EUR including installation and compaction = 4,813 EUR
Cost soil excavation: 76 cubic meters * 25 EUR = 1,900 EUR
Is this calculation realistic?
The excavated soil will be used on the property to level out unevenness.