Preparations for central air conditioning in the new building

  • Erstellt am 2020-07-14 09:41:48

Pinky0301

2020-07-14 13:24:27
  • #1
Does the KfW55 status remain with a central air conditioning system? I’m afraid not.
 

Mycraft

2020-07-14 14:16:13
  • #2

Yes, that is correct. But there are also ceiling cassettes, etc., so nothing hangs on the wall either.


Yes, for effective cooling you need about four times the amount of air. Therefore, the ventilation ducts must be planned significantly larger.

Links are not allowed here and this is really a matter for a knowledgeable planner. You can waste a lot of money here. So rather not a DIY matter.


Most likely it is actually the opposite and the status is even easier to achieve with an air conditioning system.

The air pumps for heating are also allowed and sometimes even preferred. An air conditioning system is no different.
 

Pinky0301

2020-07-14 14:22:16
  • #3
Really? I only know that there are problems with split units, so I thought it would be similar with central ones. The question is probably also whether a developer will go along with so many extra requests. The additional cost will probably be significant, considering my experience with developers.
 

Mycraft

2020-07-14 14:30:45
  • #4
For a central system, you can expect to pay 30/40/50K and up. Depending on how big the house is.


What kind of problems are supposed to occur there?
 

AllThumbs

2020-07-14 14:43:11
  • #5
The developer had suggested that the preparations be taken into account accordingly during construction and that I find a company for the installation later. For cost reasons and because they probably don't feel like doing it. Now I wanted to first see what kind of preparations are actually necessary. Possibly whether one can first have the ducts installed and observe the actual heat development over 1-2 summers. You never get the new build condition again.
 

cschiko

2020-07-14 14:48:36
  • #6
In principle, it is certainly a good idea, but if you want to prepare it, you need to know exactly what you want. For that, you should consult an appropriate planner!

As can be read in the thread about air conditioning on a south-facing slope, I am currently having a multi-split air conditioner retrofitted in an old building. If you want to pre-install it, you naturally need at least the corresponding channels for the cables to run through and, depending on the situation, also the installation possibility for ceiling cassettes, if you don't want a box on the wall.
 

Similar topics
06.02.2013Developer says: No more insulation!12
28.03.2016Ventilation or air conditioning?11
21.01.2019Installing air conditioning in new construction25
23.06.2019Does it make sense to install an air conditioner?31
27.04.2023Is an air conditioner necessary in a south-facing location?77
27.03.2020Does it make sense to retrofit an air conditioner?12
11.06.2020Active cooling function heat pump or air conditioner in new construction12
18.07.2020TGA planner with passive house experience11
30.04.2025Reversible Air-Water Heat Pump vs. Air Conditioner with Heating Function22
13.09.2020BAFA funding for heat pump (air-to-water heat pump) when building with a developer25
07.08.2021Cost of a central air conditioning system in new construction32
10.08.2021Is it possible to retrofit air conditioning if controlled residential ventilation is available?32
19.01.2022New building with underfloor heating, residential ventilation, and air conditioning21
19.05.2022Is preparing for an air conditioner worth it?68
25.04.2022Cooling ceilings instead of air conditioning, is it sensible?15
01.12.2022Is a multisplit air conditioner suitable for heating?72
11.06.2023Air conditioning new building experiences?52
19.12.2022TGA planner difficulties, underfloor heating supply temperature + wastewater ventilation124
20.01.2023Air conditioner / Instantaneous water heater as heating11
05.09.2024Split air conditioning and controlled ventilation with heat recovery44

Oben