Wastl
2017-09-20 07:21:22
- #1
Well, first we need to see where the actual competencies of the construction companies lie. I hope that the 2-meter-high wall is not an obstacle for a 30-meter-high crane. Either way, the walls have to be brought to their destination by air. Does anyone here maybe have experience in a similar case?
Normally, prefabricated house manufacturers come with a mobile crane. They only need the thing for 4 days, then it drives away again. For that, you can save yourself the crane connection on the construction site electricity.