Normally, prefabricated house manufacturers come with a mobile crane. They only need the thing for 4 days, then it drives away again. For that, you can save yourself the crane connection on the construction site electricity.
 

FizZ-

2017-09-20 09:01:47
  • #2
I assumed that it would be common to use a regular crane.. I guess that has to be clarified with the company
 

meister keks

2017-09-21 17:50:38
  • #3


A huge crane was rented by the construction company here, and they only needed it for one day. It was huge and could have handled quite a few meters of height, but that wasn’t necessary since we were the first in our settlement.
 

FizZ-

2017-09-21 19:29:04
  • #4
And how has the giant crane made itself noticed in terms of money? What is the difference between a [Auto] and a [Standkran]?
 

meister keks

2017-09-22 10:21:28
  • #5
No idea, it was not listed separately in the costs. It would have only caused additional costs if the ground had not been stable. Unfortunately, I do not know what the difference is.
 

meister keks

2017-09-22 10:25:02
  • #6
Here's a picture for reference.
 

Similar topics
23.03.2016Crane positioning: street/neighbour/railway mast29
12.10.2017Erecting a construction crane - but there's no space?27
22.12.2019Crane from the neighbor on my property67
16.07.2023Crane swing area in a very densely built-up residential area25
08.05.2025Cost of installing garages with crane20

Oben