Hello everyone,
my building savings contract pointed out to me during our new build that the potential equalization for the grounding of the satellite system may not be laid together with the other electrical cables. The green-yellow cable now runs through our bathroom in a large cable bundle clipped together all the way down.
What do you say: Does the cable for the grounding of the satellite system have to be laid separately?
I have informed the electrician, who has done nothing about it. And now time is a bit pressing, because the plumbers are preparing the floor for the underfloor heating and the cables will soon be covered.
Best regards, Redsonic
my building savings contract pointed out to me during our new build that the potential equalization for the grounding of the satellite system may not be laid together with the other electrical cables. The green-yellow cable now runs through our bathroom in a large cable bundle clipped together all the way down.
What do you say: Does the cable for the grounding of the satellite system have to be laid separately?
I have informed the electrician, who has done nothing about it. And now time is a bit pressing, because the plumbers are preparing the floor for the underfloor heating and the cables will soon be covered.
Best regards, Redsonic