Hello dear forum community,

we have decided to carry out our house building project with individual contract awarding (with an architect). Now we have received our first shell construction offer and would appreciate your assessment. I am especially interested in topics such as bricks, insulation, missing items, and realistic prices. The house will have 178 sqm including (9 sqm utility room) and will be built with 2 floors. The current plan is to build to the minimum standard of the Energy Saving Ordinance (not yet fixed). Of course, we will also discuss the offer with our architect, but multiple opinions are never wrong. I will provide missing information later.

Thank you very much.


 

Bookstar

2019-01-26 19:57:17
  • #2
140,000 euros without a basement without a double garage? and the earthworks are estimated way too low. Phew. Pretty darn expensive!

What is your total budget if the shell already costs that much?
 

ullw889

2019-01-26 21:09:51
  • #3
Region is rural Ba-Wü.

The total budget for the house alone must not exceed 400,000/410,000 including a prefabricated garage (double garage). However, excluding outdoor facilities and the flooring will be laid throughout the entire house. As mentioned, it is 178 sqm and in the basement there is a cube extension (L-shape). What would be realistic for the earthworks? The company is 5 km from the property.
 

Bookstar

2019-01-26 21:15:18
  • #4
For the earthworks, I would allocate 10,000. 400,000 without a basement, without a garden is ambitious, but doable.
 

ullw889

2019-01-26 21:24:38
  • #5
If I see it correctly, the earthworks are stated with about 2850 euros in our offer. Quite a bit is missing from the 10,000. I will discuss with our architect how this delta comes about. She knows the construction company quite well. Since you consider it expensive. Are there any noticeable points in the offer?
 

ullw889

2019-01-27 14:52:26
  • #6
Are there any further irregularities or opinions regarding the first offer? What should be paid attention to?
 

Similar topics
09.06.2013Costs of earthworks without basement15
22.08.2013Are the estimated costs of the general contractor for earthworks reasonable?12
19.08.2017Construction costs in BW for a single-family house with a 200m2 basement and double garage38
05.10.2017Cost of a single-family house 180m2 with basement and double garage14
15.06.2018Offer single-family house, 2 full floors, basement + 1 floor, what do you think?34
16.12.2018Floor plan design single-family house (city villa 140 sqm) on a slope with double garage495
08.04.2019Earthworks costs in Bavaria15
14.10.2019Dampness in the basement on the floor slab and walls25
12.07.2019Construction costs for a new 150m2 building without a basement in South Baden-Württemberg16
13.10.2019Floor plan design single-family house with basement and double garage on 540 sqm26
30.09.2019Floor plan optimization of a single-family house with a basement on a small plot178
14.10.2019Floor plan design city villa with basement improvement suggestion?77
02.06.2020Single-family house 175 sqm without basement, too big?212
05.07.2020Floor plan single-family house approx. 200 sqm double garage basement32
25.07.2020Single-family house 180 sqm, basement, 2 full floors + gable roof16
27.10.2021Single-family house with basement in NRW - is our financing solid?43
08.09.2020Earthworks costs, hillside house14
28.11.2020Expensive plot + single-family house 155 sqm + cellar KFW40+, financeable?60
25.05.2021Offer evaluation: Solid single-family house with double garage northern RLP MYK21
13.08.2021Floor plan optimization for new construction, single-family house with 2 full floors without basement on a slope33