Gerda
2012-06-27 11:07:25
- #1
Hello,
we have agreed with the developer that the tiling work (wall and floor) will be done by us on our own. Before the official acceptance, the developer does not allow "external" craftsmen on the construction site. The idea now was that we do an acceptance after completion of all trades including sanitary installation (as far as possible without tiling work); then we do the tiling work and afterwards the sanitary company (on the part of the developer) does the remaining work and there will be a "small acceptance" for this.
- Which work in the bathroom can only be done after the tiling work? (Setting the bathtub and shower tray is done before the floor/wall tiling work, right? Setting the toilet and washbasin + corresponding fittings after the tiling work)
- One shouldn’t take a risk with this approach, or should one?
Best regards
Gerda
we have agreed with the developer that the tiling work (wall and floor) will be done by us on our own. Before the official acceptance, the developer does not allow "external" craftsmen on the construction site. The idea now was that we do an acceptance after completion of all trades including sanitary installation (as far as possible without tiling work); then we do the tiling work and afterwards the sanitary company (on the part of the developer) does the remaining work and there will be a "small acceptance" for this.
- Which work in the bathroom can only be done after the tiling work? (Setting the bathtub and shower tray is done before the floor/wall tiling work, right? Setting the toilet and washbasin + corresponding fittings after the tiling work)
- One shouldn’t take a risk with this approach, or should one?
Best regards
Gerda