Maria16
2018-11-22 08:11:23
- #1
I imagine that our plumbing company itself arranged an appointment for the acceptance inspection of the gas connection. (Surprising what one no longer remembers a year after construction.)
But I am sure that we also had a "casual" conversation with the chimney sweep during the shell construction phase about everything that must be considered when installing the chimney (due to proximity to the door frame and wooden floor).
But I am sure that we also had a "casual" conversation with the chimney sweep during the shell construction phase about everything that must be considered when installing the chimney (due to proximity to the door frame and wooden floor).