chewbacca123
2018-06-13 16:29:07
- #1
The offer is missing quite a few things, including the complete drainage system with a fecal-capable lifting station. The tiles are underestimated, etc. A lot more will be coming at you. Things you don't know yet.
The planning with the equipment looks more like 500k€ plus x€, since the bathrooms will also cost you far more than the offer suggests. If the general contractor plans with 25€ per sqm tile, then I can already imagine how the sanitary equipment looks in the offer. You won't want that.
We already have the brochures, we get tiles for the hallway and bathrooms for 25 €/m² which we like. The 30 € he estimates for, for example, the living area, we won't reach because we want hardwood floors, but the 2000 - 3000 € that costs extra is okay. The devices, like the ventilation system, are from a good manufacturer. The sanitary facilities are also of good standard. That works for us, maybe a few things will get an upgrade, but otherwise okay.