we have just bought a plot of land with the prescribed type of construction: semi-detached house. Now my parents-in-law have bought the neighboring plot. Of course, we went to our prefab house planner with them and thought that we could now share some costs (travel, crane, construction equipment, etc.).
However, the site manager told us that despite the simultaneous construction of the house (2 individually planned semi-detached houses), they need 2 construction teams and 2 cranes, etc. That means we would not gain any advantages from the whole situation. (Except that we get along very well with our neighbors and can also agree on the common appearance.)
Are really 2 cranes needed for basically ONE SEMI-DETACHED HOUSE?
We are a bit confused whether the site manager (since we have already signed) wants to impose something on us and charge us more?
we have just bought a plot of land with the prescribed type of construction: semi-detached house. Now my parents-in-law have bought the neighboring plot. Of course, we went to our prefab house planner with them and thought that we could now share some costs (travel, crane, construction equipment, etc.).
However, the site manager told us that despite the simultaneous construction of the house (2 individually planned semi-detached houses), they need 2 construction teams and 2 cranes, etc. That means we would not gain any advantages from the whole situation. (Except that we get along very well with our neighbors and can also agree on the common appearance.)
Are really 2 cranes needed for basically ONE SEMI-DETACHED HOUSE?
We are a bit confused whether the site manager (since we have already signed) wants to impose something on us and charge us more?