SteffenM
2019-07-04 10:45:18
- #1
Welcome to my thread Dustin
Oh dear, it wasn’t that bad for us. We were in Kaarst, the consultation was very nice and friendly. However, the whole thing was unfortunately a bit superficial, so we would have already had to sign a preliminary contract with a floor plan that wasn’t ours. Ultimately, the price was the clear deciding factor. If it had been 40-50k € lower, we might have signed with Viebrockhaus.
And yes, the lack of transparency (the battery capacity and output of the photovoltaic system are only mentioned somewhere in the fine print) is also more for the unmotivated builder.
Currently, they can probably afford quite a bit. If you read in relevant F*cebook groups, the start of construction for contracts recently signed (for the beginning of the much-praised construction time guarantee!) is at calendar weeks 13-34 (depending on the region) 2020!
At that point, I might as well build conventionally and it wouldn’t take any longer.
Oh dear, it wasn’t that bad for us. We were in Kaarst, the consultation was very nice and friendly. However, the whole thing was unfortunately a bit superficial, so we would have already had to sign a preliminary contract with a floor plan that wasn’t ours. Ultimately, the price was the clear deciding factor. If it had been 40-50k € lower, we might have signed with Viebrockhaus.
And yes, the lack of transparency (the battery capacity and output of the photovoltaic system are only mentioned somewhere in the fine print) is also more for the unmotivated builder.
Currently, they can probably afford quite a bit. If you read in relevant F*cebook groups, the start of construction for contracts recently signed (for the beginning of the much-praised construction time guarantee!) is at calendar weeks 13-34 (depending on the region) 2020!
At that point, I might as well build conventionally and it wouldn’t take any longer.