Oops, you are already quite far along :)



I think screed and drywall will be included. But no floor and painting work. No wall tiles! No putty work... It is questionable whether, for example, the interior doors are included. "Sanitärrohinstallation" - as far as I know, all sanitary fixtures are missing! The construction service description gives you more information: everything that is not listed is also not included (in the price).

In addition, the windows will be white, the exterior plaster the simplest without colored nuances or even wood cladding.
 

ypg

2015-02-17 13:29:02
  • #2
And then it must be said that you have to pay real estate transfer tax on the land as well as on the purchase price - ok, you have to do that with a used property too!
 

Bauexperte

2015-02-17 13:35:02
  • #3
Hello


I haven’t had a Bien-Zenker building specification on my desk for a long time; however, screed should be in place, otherwise the rough-in installation of electrical and sanitary systems makes little sense. So you should wait for the service specification.


Well, for example, a lot of filling work might be waiting to be done ... interior doors might be waiting to be installed (but that only works if tiling is included in the scope of work). "Final finishing" doesn’t sound like it only includes painting and flooring work as the only remaining option.

Rhenish greetings
 

Similar topics
29.01.2014Cost saving/basement/affordable tiles/sealed screed?13
08.05.2014Most moisture from screed?25
10.05.2015Screed uneven - defect removal refused52
10.08.2015In which season of the year is it best to bring screed into the basement10
13.04.2017Screed with gold sand17
28.04.2016Order screed - plaster14
27.05.2016Plastic fittings/water pipes and insulating underfloor heating beneath screed?40
07.08.2016Upper floor without screed - only concrete floor15
08.06.2016Questions about underfloor heating - new subfloor/screed/granite tiles14
31.07.2016Screed does not extend into the reveals at windows / terrace doors on the ground floor12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
31.10.2016Heating the screed with the utility provider?!12
29.11.2016Front door only burglary protection / better materials - plaster, screed?10
02.02.2017Is ventilation/drying after installing screed/interior plaster sensible?15
05.04.2017Super disaster - water pipe burst, screed damp31
09.04.2017Screed is too low. Are there standards for this?16
30.04.2017Screed applied too high - room height consequently lower11
05.08.2017Screed necessary? Unfinished but insulated attic23
19.08.2017Technical room before installing screed: should the technology be painted now or later?16

Oben