Is it possible to work on a DIY basis in parallel with craftsmen?

  • Erstellt am 2020-12-12 18:35:11

Connilein

2020-12-12 18:35:11
  • #1
Hello,

we now have a date for when our house is supposed to be ready for occupancy. Now I was wondering if it is possible to paint the bedrooms and lay the floor on the upper floor in parallel with the tiler? Or does one have to coordinate with the trade? Of course in such a way that you don’t get in the way of the craftsman. Would something like that be possible? It would also save time.
 

Trademark

2020-12-12 22:59:32
  • #2
How are you building?
 

Tassimat

2020-12-12 23:07:59
  • #3
Yes, no problem. There are always many people working in parallel. However, if it is a developer, I would obtain permission.
 

Tolentino

2020-12-13 01:26:14
  • #4
There are contracts that state the construction is considered accepted as soon as work on own contribution begins. So better clarify with the general contractor that this does not apply to you....
 

Olli-Ka

2020-12-13 03:07:44
  • #5
Hi, if it’s not a property developer, why not. But I would discuss it with the BU beforehand. Olli
 

Scout

2020-12-13 08:42:05
  • #6
Our general contractor had prohibited this in his contract. It would have only been possible after partial acceptance.

After the tiler, painters, stair builders, and installer/electrician for fine installation may still come. What if your floor is scratched the next day, then everyone will want to deny responsibility.
 

Similar topics
06.02.2013Developer says: No more insulation!12
23.03.2011Developer or architect?15
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
16.07.2012The builder "outsources" fixed-price services to subcontractors12
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
18.02.2014Massive problems with the builder - is contract termination possible?33
23.06.2014Developer charges heavily for replanning - justified?12
08.10.2014How do you search for a suitable property developer?30
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
01.03.2015The developer does not build according to the plan14
12.05.2016Individual bathroom planning despite the developer (and saving money...)14
13.08.2017How do I recognize a good tiler for large tiles?13
01.01.2018Order tiling materials yourself - tiles12
13.02.2019Tiler costs 200m² new construction42
21.03.2019Construction description from our developer13
26.10.2021Remove the tiler and assign the work yourself or not?19
14.02.2022Painter and tiler evaluation11