Heidi1965
2020-12-12 22:29:55
- #1
Next week the screed in the new building will be installed. Until now, I thought it would have to dry for at least 6 weeks before the tiler can start. Now the contractor says it can be done immediately after it is walkable; moreover, the tiler is available immediately and we should make sure to get the tiles.
So either immediately or after 6 weeks. Where is the logic in that, and how can the screed dry with large tiles (60 x 60 cm) on top?