In my building application it says somewhere - I think in the fire protection section - what the 1st and what the 2nd escape route is. During planning, two windows had to be wider in the attic than those on the other side. Precisely because of the 2nd escape route. So I have 1.01m and 1.26m wide floor-to-ceiling windows on one and the other facade side upstairs.