Is a structural engineer for testing necessary?

  • Erstellt am 2010-08-17 20:02:57

paulino

2010-08-17 20:02:57
  • #1
Hello community,

is it true that at least in Berlin for a Plattenfundamentierung (reinforced slab foundation) kein Prüfstatiker is necessary?

Thanks

paulino
 

Bauexperte

2010-08-19 11:54:52
  • #2
Hello Paulino,



The tasks of a structural engineer for verification include, among other things, checking the slab or a basement and the statics of all ceilings and walls before they are poured with concrete.

Who - do you think - is liable for damages if no structural engineer for verification is consulted? Btw, in my opinion it makes no difference in which federal state is built - a structural engineer for verification is always needed.

Kind regards
 

paulino

2010-08-19 19:03:56
  • #3
yes, thank you

paulino
 

Similar topics
21.10.2011Floor slab insulation "Yes!" or "No!"14
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
26.10.2012External perimeter insulation floor slab, basement mold risk11
21.11.2013Is the floor slab still possible this year?15
15.07.2014Foundation slab for Danwood bungalow? Company for complete works?11
23.11.2014Stone throw on foundation slab - builder's liability insurance?16
15.06.2015Base slab or strip foundations for garage12
07.09.2015Minimum distance from the base plate?11
11.09.2016Base plate - construction/insulation etc. - experiences please!10
29.06.2016Brandenburg Building Regulations / July 1, 2016 - Structural verification engineer no longer required11
05.08.2016Leave the floor slab over winter15
20.08.2016Base slab vs strip foundation15
13.09.2016Insulation under the floor slab EPS or XPS?12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
06.10.2016Base plate with defects?22
27.11.2016Double insulation below and above the floor slab?10
22.07.2017Horizontal sealing of the base slab24
18.08.2017Base plate ready - construction supervisor absent20

Oben