I have illustrated it here in a layman's way.
1. The community channel at the property boundary was already in place.
2. The wastewater pipe and the inspection shaft were installed in August. By the builder.
3. The wastewater pipe that was led out of the base slab. Factory-made.
The slope between 1 and 3 was only 6 cm over a distance of 15 meters.
Now the general contractor says that the shaft (2) as a reference point was not present when the base slab (3) was poured and therefore the too deep wastewater connection does not constitute a defect.