Hello everyone,

we submitted the building notification on Monday and only at that time learned the final height specifications.

The following resulted:

- 30.24 m above sea level top edge finished shaft
- 30.00 m above sea level top edge planned ground (-0.24)
- 30.25 m above sea level top edge finished floor (+0.01)

- We need to fill about 1 m at the lowest point.

The top edge of the finished floor is thus just about 1 cm above street level and the planned ground just below (-0.24). What do you think of the above values? Am I possibly too low? Of course, I want to avoid a lift station or some backflow protection

 

andimann

2017-05-24 17:37:12
  • #2
Hi,
the important thing is the bottom of the shaft; you have to be clearly above it so that the water can actually flow into the sewer by gravity.

However, you will hardly be able to avoid a backwater valve or lifting system if you have a basement.

Without a basement, you actually don't need it, except for a floor-level shower on the ground floor. Every drain has to be higher than the top edge of the finished shaft.

It should be noted that the top edge of the finished shaft is sometimes given without the fine asphalt layer (this is the case with us) and a house construction is not always entirely precise. (For example, our house stands 3 cm too low). This can quickly turn a +1 cm height difference into -5 cm.

So don't plan too tight.

Best regards,

Andreas
 

Similar topics
30.09.2015Floor plan of a single-family house with basement19
21.02.2016Is wastewater drainage possible in the basement?18
21.05.2016Lifting system backflow plate20
15.12.2016Top edge of finished floor and road construction height: poorly planned?21
13.05.2019Floor plan single-family house, 140 sqm with basement40
10.06.2021Optimal height of finished floor level to street edge75
12.01.2018Building height of 8.5 m with basement and 2 full floors31
28.01.2018Are backwater valves always necessary in flood-prone areas?20
30.05.2018Base plate on the top edge or bottom edge? Who has experience?10
05.11.2018Do we need a lifting system as the architect suggests?13
02.04.2019Building plot: Massive fill or better basement with excavation?28
02.04.2020Possible building plot - shaft on the property28
07.07.2020Plot 1.5m below street level – lifting system?12
07.12.2020Is backflow protection required in construction projects?14
18.05.2021Damp basement from inside or outside?15
19.01.2022Tips for sauna in the basement & tips for gym in the basement16
09.02.2022Floor plan: Building on a slight slope - not enough for a basement due to excavation?22
25.05.2022Cover shaft 1.5 x 1.5 concrete like structure25
03.03.2024Basement or ground slab: which is more sensible for the property situation?55
28.05.2024Water in the shaft of the lifting system19

Oben