Lulu24118
2017-05-24 16:44:17
- #1
Hello everyone,
we submitted the building notification on Monday and only at that time learned the final height specifications.
The following resulted:
- 30.24 m above sea level top edge finished shaft
- 30.00 m above sea level top edge planned ground (-0.24)
- 30.25 m above sea level top edge finished floor (+0.01)
- We need to fill about 1 m at the lowest point.
The top edge of the finished floor is thus just about 1 cm above street level and the planned ground just below (-0.24). What do you think of the above values? Am I possibly too low? Of course, I want to avoid a lift station or some backflow protection


we submitted the building notification on Monday and only at that time learned the final height specifications.
The following resulted:
- 30.24 m above sea level top edge finished shaft
- 30.00 m above sea level top edge planned ground (-0.24)
- 30.25 m above sea level top edge finished floor (+0.01)
- We need to fill about 1 m at the lowest point.
The top edge of the finished floor is thus just about 1 cm above street level and the planned ground just below (-0.24). What do you think of the above values? Am I possibly too low? Of course, I want to avoid a lift station or some backflow protection