Leon
2013-05-17 12:35:36
- #1
Hello everyone,
so, after a long back and forth and comparing, we now have a, in our eyes, serious offer from a developer. I would like to hear a few opinions on this. Too expensive / too cheap / where to be especially careful?
We are building a
single-family house with 144 sqm living space, gable roof, 38°, knee wall 1.50, without basement > with slab, without garages, air-water heat pump with automatic ventilation system, chimney, KfW 70, architect and all applications included (except development), turnkey, terrace made of concrete without floor is included, TÜV approval
for just under 270,000 euros. Kitchen and stove as well as disposal of earth excavation and of course the complete development will be added.
Can one, without posting the exact cost breakdown here, already say this is going in the right direction or rather too expensive? Price per sqm would be about 1,875 euros... although I don’t know if you can already include the fees for applications, architects etc., or whether you only divide material and labor by the 144 sqm.
Does anyone happen to also have a path of about 40m from the street to their single-family house and can tell me how much one should expect for development there? Both EnBW and Kabel BW are giving me too much back and forth. I can’t get a definitive answer.
Thanks already for your answers!
Regards, Leon
so, after a long back and forth and comparing, we now have a, in our eyes, serious offer from a developer. I would like to hear a few opinions on this. Too expensive / too cheap / where to be especially careful?
We are building a
single-family house with 144 sqm living space, gable roof, 38°, knee wall 1.50, without basement > with slab, without garages, air-water heat pump with automatic ventilation system, chimney, KfW 70, architect and all applications included (except development), turnkey, terrace made of concrete without floor is included, TÜV approval
for just under 270,000 euros. Kitchen and stove as well as disposal of earth excavation and of course the complete development will be added.
Can one, without posting the exact cost breakdown here, already say this is going in the right direction or rather too expensive? Price per sqm would be about 1,875 euros... although I don’t know if you can already include the fees for applications, architects etc., or whether you only divide material and labor by the 144 sqm.
Does anyone happen to also have a path of about 40m from the street to their single-family house and can tell me how much one should expect for development there? Both EnBW and Kabel BW are giving me too much back and forth. I can’t get a definitive answer.
Thanks already for your answers!
Regards, Leon