House construction delay, how to respond?

  • Erstellt am 2013-09-06 18:44:08

Musketier

2013-09-11 18:38:19
  • #1


I have also seen this in some housing developments with newly completed houses, where the drainage was not yet dug and the water was directed into the street drain using long channels.
 

ypg

2013-09-11 19:45:19
  • #2


Only that our rain gutter is quite high due to a high knee wall and the pipe remains are barely a meter long... he clipped it to the scaffolding.

Even in the man... A pity, I actually wanted to photograph the idea today, but didn't have a memory card in the camera
 

Christian AHS

2013-09-12 10:42:37
  • #3
With us, the drain is too far away from the gutters - I would have to lay about 30-35 meters for all four downpipes.

Hoping for a few drier days and that the window installation begins today.
 

Christian AHS

2013-09-12 10:44:00
  • #4
PS: in Bavaria I saw something cool - instead of doing a DIY project with the pipes, they simply glued the drainage pipes (flexible) to the gutter and guided them down to the sewer like a snake. If it's not storming heavily, definitely a good option.
 