abc12345
2020-11-05 08:15:30
- #1
Hello everyone, I have a base slab and now want to start building with 24 cm concrete formwork blocks on it. (It will be a pool). Do I now lay the first row of formwork blocks in a mortar bed and align them in it, or do I simply align the blocks "dry" and then concretize the first two rows directly, e.g., with concrete and reinforcement? Does that make a difference? Thanks for your answers.