Lukas_N
2022-08-10 14:29:06
- #1
Hello everyone,
the screed layer left some sand over. Since I have to fill 2 earth pits with sand anyway, one from the fresh water pipe and the other from the electricity/telecommunications line. It is generally known that pipes and cables should be sanded as much as possible.
Now the question: Is this sand suitable for filling earth pits? Frost resistance? etc.?
Regards
Lukas
the screed layer left some sand over. Since I have to fill 2 earth pits with sand anyway, one from the fresh water pipe and the other from the electricity/telecommunications line. It is generally known that pipes and cables should be sanded as much as possible.
Now the question: Is this sand suitable for filling earth pits? Frost resistance? etc.?
Regards
Lukas