T_im_Norden
2021-03-16 12:00:23
- #1
The drilling depth should correspond to the design of the heat pump; if the output of the drilling is too low, there may be problems. For more specific questions regarding the brine and drilling or the trench collector, I can only recommend the forum that Crink also uses. Have you already received a plan for the underfloor heating? Have you specified temperatures for the heat load calculation? If not, it was calculated with 24 degrees for bathrooms and 20 degrees for the rest.