PPeanuts74 2017-07-12 15:15:29#1The excavated material often cannot be used again for backfilling. With us, I believe it was over 600 m³ and nothing was tested; only the pit was measured and billed according to m³.
The excavated material often cannot be used again for backfilling. With us, I believe it was over 600 m³ and nothing was tested; only the pit was measured and billed according to m³.