Excavation of construction pit - analysis of excavation material?

  • Erstellt am 2017-06-19 22:08:45

Peanuts74

2017-07-12 15:15:29
  • #1
The excavated material often cannot be used again for backfilling. With us, I believe it was over 600 m³ and nothing was tested; only the pit was measured and billed according to m³.
 
Oben