How long should the beam be? At 4 m, 50 cm doesn't matter, but at one meter, it probably does. The way the structural engineer acts is rubbish; that's not how you treat a client. However, a structural calculation is not a design; if this was communicated to you incorrectly, that is very frustrating. The structural calculation tells you that you need an HEB 200 and that it must be supported on the masonry by at least 30 cm. The length is to be determined with a measurement.