Energy consulting for extension *facepalm*

  • Erstellt am 2021-10-04 10:47:46

In der Ruine

2021-10-04 10:47:46
  • #1
Finally, the building permit is granted and yet it is still not enough to start building. Architect, structural engineer, soil expert, surveyor of course are not enough. For a simple extension, according to the building permit, I also have to pay an energy consultant. No wonder that a puny single-family house costs about 1 million DM today. :eek:
 

Tom1978

2021-10-04 10:53:59
  • #2


Since last week (after 9.5 months) we have the construction clearance. But the companies are not allowed to cross the sidewalk. Because that requires a separate permit. As if you couldn’t just combine everything...
 

RE-1407

2021-10-04 11:43:27
  • #3
With 15 months waiting time for the building permit, I'm complaining to you guys :) Because of missing bicycle racks in the drawing :) :) :) ....laughing to death...
 

guckuck2

2021-10-04 12:12:56
  • #4


The thermal insulation certificate is required and nothing new, it says everywhere. Complain to the client and their planner.



Again, complain to the client or their planner. For the crossing, one could (would have to) apply for an exemption directly. Amateur mistake.
 

Tom1978

2021-10-04 12:18:06
  • #5


According to the authority, the approval can only take place once the building permit is available. I am the client. However, I will write a written complaint to myself...
 

11ant

2021-10-04 13:00:03
  • #6
What is meant by this: the protection of the sidewalk during the phase of regular crossing with heavy trucks, in Teutonic bureaucratic perfection of course with illuminated warning barriers, because the planks represent a tripping hazard (thankfully not a meter high, otherwise they would have to be handrailed) and according to DIN EN 0815-4711 a standard edge warning tape (in double version: white-red striped for uninvolved persons, black-yellow striped for employees) is not sufficient???
 

Similar topics
31.10.2008Is a building permit also required for a carport and equipment shed?13
15.02.2011Building permit application12
27.09.2018Cost of building permit in exemption procedure, new construction11
19.03.2015Questions about the building permit21
28.11.2024Neighbor's lawsuit against approved building permit46
18.03.2016Influence of the neighbor in building permit18
16.01.2017No building permit as long as the land is not developed?10
20.08.2017Issuance of the building permit?24
31.12.2017Winter garden conversion - building permit required or permit-free?15
08.01.2018According to the law, the building permit is automatically granted if12
22.01.2018Building on still foreign land - Waiting for building permit25
21.06.2018What must be included in the building permit? Legal certainty?19
29.08.2018Filling up a raised plot of land to make it level - building permit required?16
18.09.2018Immission protection concerns self-service gas station - building permit?20
24.10.2018Broker sells house without current building permit. Notary costs?25
26.01.2019Building permit from 1931 not adhered to35
08.04.2019Can the garage be moved after obtaining the building permit?11
09.09.2022Experiences with forest conversion in the context of building permits in Brandenburg20
28.08.2019Building permit for terrace roofing14
06.09.2019Construction project and building permit feasible?97

Oben