Kishihmen
2021-09-08 14:42:54
- #1
Hello everyone,
we are currently building 3 terraced houses. Since our general contractor has stopped the work, we were unfortunately forced to halt the construction. At the moment, we have a completed basement and a finished ground floor including the ceiling above the ground floor. The houses are already connected including multi-utility house entry.
The construction site power box belongs to the electrician of the general contractor and will likely be picked up soon.
For us, the question now is whether we need a new construction site power box (including interim billing and re-registration with Netze BW) or whether it might be possible or allowed to already install and register the meter cabinet in the basement now so that we no longer rely on construction site power afterwards.
- The basement is not to be plastered and thus remains in its current state.
If I have forgotten any relevant information, please feel free to ask.
we are currently building 3 terraced houses. Since our general contractor has stopped the work, we were unfortunately forced to halt the construction. At the moment, we have a completed basement and a finished ground floor including the ceiling above the ground floor. The houses are already connected including multi-utility house entry.
The construction site power box belongs to the electrician of the general contractor and will likely be picked up soon.
For us, the question now is whether we need a new construction site power box (including interim billing and re-registration with Netze BW) or whether it might be possible or allowed to already install and register the meter cabinet in the basement now so that we no longer rely on construction site power afterwards.
- The basement is not to be plastered and thus remains in its current state.
If I have forgotten any relevant information, please feel free to ask.