Heisenberg
2014-04-28 00:14:41
- #1
The earthworks on our property are due. The developer plans an earthwork depth of approximately 1.50 m (peat layer) for the house.
How is it with the ancillary facilities such as the driveway and terrace?
That would be about 200 sqm for us. Do we also have to have them excavated that deep?
The developer has given us an offer for the ancillary facilities of about €10,000.
Topsoil replacement 286 cubic meters
Filling sand installation (1.70m) 324 cubic meters
How is it with the ancillary facilities such as the driveway and terrace?
That would be about 200 sqm for us. Do we also have to have them excavated that deep?
The developer has given us an offer for the ancillary facilities of about €10,000.
Topsoil replacement 286 cubic meters
Filling sand installation (1.70m) 324 cubic meters