Redsonic
2016-04-26 23:37:18
- #1
What have you agreed with the civil engineer? Does he assume that everything is cleared or does he know the property as uncleared?
Not at all yet, that's the point. According to the contract for work, the property must be cleared. Later we stand with the general contractor on the construction site for inspection, and then we have 6 weeks to create building clearance. I just have concerns that, as HilfeHilfe says, one might come under pressure afterwards. However, the question is also to what extent I can get anywhere at all with such a 1.5-ton excavator.
Ultimately, I read out that it will not be a matter of 50 or 300 EUR into the pocket of the wheel loader driver.