Perhaps also consider changing providers once in a while. The construction electricity tariff is usually not the cheapest tariff. So you have some control yourself.
We have also arranged construction power through other providers, either specify it at the time of order or re-register using the meter number.
We also switched providers immediately after the house connection to avoid default supply.
This usually works with the market location number or the meter number.
Since when is the contractor the electricity provider? Doing more than a rejection that it’s not possible probably won’t happen. No one could tell me whether it works or not either. I tried it and can say it works. Even changed the construction power monthly and each time took the bonus via the portals ;)