lesmue79
2020-02-19 06:11:48
- #1
Okay, thanks already, I was a bit unsettled because the heating engineer noted a minor defect on his protocol during the handover. However, nowhere was a defect-free acceptance explicitly checked. All the work I have done on the house so far by myself (installing corner valves on the washbasin) or by another company commissioned by me (installing a photovoltaic system on the roof) took place in consultation with the site manager and/or the main contractor’s trade.