Hello,
my front door was installed last week, afterwards the connection was plastered.

as you can see, the angle of the wall here is not 90 degrees, not even close (it clearly looks like it runs inward). This only happens here, at no other window etc. Does anyone know if there is a standard for this? The developer is of the opinion that this is just how it is and cannot be changed, after all, you never really know exactly how wide the door really is. Everything would be fine like that, etc...

On the other side, I have seen at several houses that it is not like this there...
It is also like this on the outside...

Of course, nothing about this detail is stated in the construction contract...

Thanks for the help. Regards
Philipp
 

Jann St

2020-10-24 20:57:55
  • #2
Hello,

There is the DIN18202 for the plastering trade. The deviation from the right angle is indicated as the so-called Stichmaß. So the gap between the wall and the right angle in relation to the respective length. Of course, this can also be done with a spirit level.

This is of course fixable but actually quite elaborate. Is it a developer or a construction contractor?

Best regards, Jann
 

Bookstar

2020-10-24 21:26:40
  • #3
I consider it completely normal. By the way, it is the same with us.
 

Similar topics
06.02.2013Developer says: No more insulation!12
23.03.2011Developer or architect?15
26.09.2011Finding tiles from other manufacturers / sample selection for builders13
09.07.2012Developer offer for single-family house - Are the construction costs acceptable?16
16.07.2012The builder "outsources" fixed-price services to subcontractors12
03.08.2012Contract Supplement to the Construction Contract by the Developer36
30.09.2012Developer - Is withdrawal from the purchase contract possible?11
01.12.2014Real estate transfer tax / what is the tax applied to? Which developer MUST?30
18.02.2014Massive problems with the builder - is contract termination possible?33
23.06.2014Developer charges heavily for replanning - justified?12
08.10.2014How do you search for a suitable property developer?30
27.02.2015Construction project with a developer without an official building plan, is a down payment required?12
01.03.2015The developer does not build according to the plan14
15.04.2015Duplex construction: Joint or separate developer?20
13.06.2015New construction with developer / construction drawing documents23
09.09.2015Buy land separately from the developer13
24.12.2015Single-family house, Energy Saving Ordinance 2016, developer recommends additional insulation - is it sensible?39
15.03.2016Developer changes plot size25
16.03.2016Single-family house - developer rejected25
12.05.2016Individual bathroom planning despite the developer (and saving money...)14