Thank you for the information.
So far, I have received different answers repeatedly.
Why are the regulations in this country so complicated for such simple questions?
The calculations are not comprehensible for a normal builder. The Excel list from the University of Kassel mentioned in the forum is too complicated for me.
Who can you contact if you want to have the calculations done independently of your own architect?
I already have the building permit.
Bungalow, cold roof, 36 masonry, no basement.
Planned:
1. Gas condensing boiler
2. Controlled residential ventilation Systemair SAVE VTR 250 / DE rotary wall unit, with EU 7 pollen filter
3. Photovoltaic system approx. 3.75 kWp with BYD B-BOX-H6.4 (6.4 kW) battery.
So far, I have received different answers repeatedly.
Why are the regulations in this country so complicated for such simple questions?
The calculations are not comprehensible for a normal builder. The Excel list from the University of Kassel mentioned in the forum is too complicated for me.
Who can you contact if you want to have the calculations done independently of your own architect?
I already have the building permit.
Bungalow, cold roof, 36 masonry, no basement.
Planned:
1. Gas condensing boiler
2. Controlled residential ventilation Systemair SAVE VTR 250 / DE rotary wall unit, with EU 7 pollen filter
3. Photovoltaic system approx. 3.75 kWp with BYD B-BOX-H6.4 (6.4 kW) battery.