Construction is continuously delayed - call the site manager?

  • Erstellt am 2018-04-20 06:50:54

Bentovic

2018-04-22 08:29:43
  • #1
Hi, the problem is that the quality sometimes suffers if you only apply pressure shortly before the deadline. During our renovation, I gave the drywall installer / painter a good time window. It was manageable. In the end, it was tight and the quality was poor. There was a discount, but in hindsight, I would have preferred to ask for a correction. At that time, the move was imminent (I still had to install 10 doors and 100 linear meters of baseboards), I was on a business trip on the side and had scheduled a bunch of people privately. Plus, it was the week before Christmas.

Conclusion: not only point out the final deadline early, but also the quality to be maintained, which may have to be ensured by rework to meet the final deadline.

Stephan sent via T.alk
 