Joedreck
2017-07-22 07:42:14
- #1
I also claim that it will be very tight. Depending on how many helpers there are. We had to hire a professional for the wallpaper, for example (just for removing, mind you), because the old ones were multi-layered and extremely firmly attached. Otherwise, we would have gotten seriously behind schedule. Today and tomorrow, the screed will be ground and then leveled (including vinyl). In my opinion, the preparation always takes the most time. And what consumes a lot of time is when materials are missing. Then there are everyday things that also need to be done. Whether we will make it by September is questionable. Although with our own work, we are rather within the time frame. Coordinating the craftsmen is challenging. And not all of them always have time!