Joedreck
2021-08-08 22:31:39
- #1
So, I have received these offers (excluding VAT):
1.) €17/ton -> transport included, cannot maintain high frequency.
2.) €25/ton -> transport included, can maintain high frequency.
3.) €31/ton -> offer from the civil engineer, who delivers the soil to 2.)
We estimate we have 1000 tons.
The additional charge of €6/ton for loading into the trucks is a thorn in our side and could have been considered in the cost calculation.
It feels like we’re paying almost twice as much with the civil engineer.
We are considering whether to postpone the construction by 2 weeks and have most of the work done by a friendly excavator operator.
If that is a realistic option then definitely!