klausffm
2018-04-29 11:23:35
- #1
We had a complete shower (Duschtempel) until 3 days ago, which gave up after 6 years. Now I want to build a shower tray. I know the slope to the drain must be 2%. I want to build a formwork max 5cm high, then lay styrofoam boards in the area and fill the whole thing with screed. Then tile the screed. The drain is in the floor and at the back wall. How thick should the screed be? And how do I best achieve the slope? I am happy to receive tips.
Greetings from Frankfurt, Klaus