AnSe2019
2019-09-30 18:59:41
- #1
Excerpt from the construction specification: "The foundation slab will be constructed as a reinforced concrete base according to the structural analysis and taped on the top side. Below the foundation slab, 8 cm of insulation will be installed. Installation of a grounding flat steel." If the black one is a foil, then it would be beneath the slab and not taped on the top side. Or am I seeing that wrong??