Hi @ all,
we have reserved a plot of land in Lampertheim (Hessen).
It has a size of 428sqm.
Previously, there was a scrap dealer/recycling center on the site, so the city has now excavated the entire area by an estimated 1.80m.
In other words, it would first have to be filled up again by about 1.80m. The street is almost finished.
The question now is, what is cheaper for me, this filling or maybe a basement construction?
We want to build with a prefabricated house manufacturer and the house will have exterior dimensions of about 9x11m.... so about 140-150sqm living space.
Where would the costs roughly be for such a filling? Or a finished basement?
Thanks and regards
Sven
we have reserved a plot of land in Lampertheim (Hessen).
It has a size of 428sqm.
Previously, there was a scrap dealer/recycling center on the site, so the city has now excavated the entire area by an estimated 1.80m.
In other words, it would first have to be filled up again by about 1.80m. The street is almost finished.
The question now is, what is cheaper for me, this filling or maybe a basement construction?
We want to build with a prefabricated house manufacturer and the house will have exterior dimensions of about 9x11m.... so about 140-150sqm living space.
Where would the costs roughly be for such a filling? Or a finished basement?
Thanks and regards
Sven