Jan Latta
2017-10-20 00:04:44
- #1
Hello dear friends,
We are building a single-family house in [Unterfranken] and have received an offer for additional costs from our pipe installer. Intended are the fixing of the terrace 25 m2, access paths 10 m2, and parking space 36 m2 as well as water/sewage connections. I do not understand several things from the offer, so I ask for your evaluation whether this is okay. Soil class 3-5 Earthworks: 1 Construction site setup 418.00 2 Remove topsoil, store sideways - quantity 70 m2 - 238.00 3 Excavation for soil replacement (terrace 25 m2, access paths 10 m2, driveway 35 m2) - quantity 35 cbm - 495.60 4 Base layer of gravel grain 0/32 gravel mix (terrace 40 m2, access paths 120 m2 ???, parking space 36 m2) - quantity 75 t - 1586.25 5 Load, transport and dispose of excavation material at landfill - quantity 52.5 cbm - 1411.20 Total 4149.05 Euro + 19% VAT = 4937.3695
Water/sewage: 1 Pipe trench excavation as well as backfilling of the base pipes on the construction site ... excavation depth up to 2m, trench width up to 0.75m - quantity 46.875 cbm - 1068.75 2 KG pipes, DN 100, laid in trenches with slope - quantity 50 m ?? - 773.00 3 KG elbows and fittings DN 100 - quantity 30 pieces - 327.00 4 KG branches DN 100 - quantity 4 pieces - 51.76 5 KG pipes DN 150, laid in trenches with slope - quantity 20 m - 433.00 6 KG elbows and fittings DN 150 - 20 pieces - 371.20 7 KG branches DN 150 1 piece - 21.18 8 Create drop shaft - shaft width 1m, shaft height 3.5m - 1208.11 9 Pipe trench excavation for TW pipe as well as backfilling ... excavation depth up to 1.2 m, trench width up to 0.75 m - 583.50 Total 4837.50 Euro + 19% VAT = 5756.63 Euro
Are the prices okay as they are or is it already too much?
We are building a single-family house in [Unterfranken] and have received an offer for additional costs from our pipe installer. Intended are the fixing of the terrace 25 m2, access paths 10 m2, and parking space 36 m2 as well as water/sewage connections. I do not understand several things from the offer, so I ask for your evaluation whether this is okay. Soil class 3-5 Earthworks: 1 Construction site setup 418.00 2 Remove topsoil, store sideways - quantity 70 m2 - 238.00 3 Excavation for soil replacement (terrace 25 m2, access paths 10 m2, driveway 35 m2) - quantity 35 cbm - 495.60 4 Base layer of gravel grain 0/32 gravel mix (terrace 40 m2, access paths 120 m2 ???, parking space 36 m2) - quantity 75 t - 1586.25 5 Load, transport and dispose of excavation material at landfill - quantity 52.5 cbm - 1411.20 Total 4149.05 Euro + 19% VAT = 4937.3695
Water/sewage: 1 Pipe trench excavation as well as backfilling of the base pipes on the construction site ... excavation depth up to 2m, trench width up to 0.75m - quantity 46.875 cbm - 1068.75 2 KG pipes, DN 100, laid in trenches with slope - quantity 50 m ?? - 773.00 3 KG elbows and fittings DN 100 - quantity 30 pieces - 327.00 4 KG branches DN 100 - quantity 4 pieces - 51.76 5 KG pipes DN 150, laid in trenches with slope - quantity 20 m - 433.00 6 KG elbows and fittings DN 150 - 20 pieces - 371.20 7 KG branches DN 150 1 piece - 21.18 8 Create drop shaft - shaft width 1m, shaft height 3.5m - 1208.11 9 Pipe trench excavation for TW pipe as well as backfilling ... excavation depth up to 1.2 m, trench width up to 0.75 m - 583.50 Total 4837.50 Euro + 19% VAT = 5756.63 Euro
Are the prices okay as they are or is it already too much?