Hello everyone,
we have just bought a new-build apartment, and since the non-load-bearing walls have not yet been built, we decided to make a small change.
I would be grateful if you could briefly assess this additional offer,
originally a normal passage was planned and at this point we want to provide a sliding door that disappears into the masonry.
Here are the additional costs from the main contractor:
1. Delivery and installation of concrete lintel (11.5x11.5x250cm) + masonry work: €338
2. Sliding door unit for an opening of 90cm: €910
3. Embedding the sliding door unit, double plasterboard on both sides + plastering work: €498
4. Sliding door: €395
Prices are without VAT. I find especially the price for the lintel and the plasterboard very high..
Is it generally possible to negotiate such offers or do you think the price is justified?
Many thanks
chaaali
we have just bought a new-build apartment, and since the non-load-bearing walls have not yet been built, we decided to make a small change.
I would be grateful if you could briefly assess this additional offer,
originally a normal passage was planned and at this point we want to provide a sliding door that disappears into the masonry.
Here are the additional costs from the main contractor:
1. Delivery and installation of concrete lintel (11.5x11.5x250cm) + masonry work: €338
2. Sliding door unit for an opening of 90cm: €910
3. Embedding the sliding door unit, double plasterboard on both sides + plastering work: €498
4. Sliding door: €395
Prices are without VAT. I find especially the price for the lintel and the plasterboard very high..
Is it generally possible to negotiate such offers or do you think the price is justified?
Many thanks
chaaali