akki
2010-08-16 21:42:59
- #1
ok, thanks for the help. I now only have concerns because the sewage channel, which is located a bit deeper than 80 cm, is exactly where our extension ends. the channel would then lie exactly under a part of the 80 cm deep poured foundation. is that bad, does the load distribute or will the stone pipe break? best regards Axel