Where is the foreextension located in the site plan?

  • Erstellt am 2022-08-25 12:03:23

Schwabe23

2022-08-25 12:03:23
  • #1
A silly question, what is actually inside the black pipe that always protrudes from the ground on developed building plots? (see photo) We planned the house on it. We thought it was the connection for electricity etc. According to Netze BW, however, the preliminary extension is at exactly the other end of the property. The result is 30 m of cable length. The multi-utility connection is now supposed to cost us €9,800.

That can't be right? There is really nothing recognizable for us in the site plan. Netze BW, however, says we should place the order and then we will clarify it with the executing company.
 

Schwabe23

2022-08-25 13:18:25
  • #2
Thank you, but could it be that the electricity and telephone are then on the other side of the property?
 

schubert79

2022-08-25 13:47:31
  • #3
Of course. It was the same with us. But the price is a joke!
 

Similar topics
08.11.2013Electricity at the house connection for provider - Installation of server cabinet10
08.08.2016Connection costs for telecom, cable, electricity10
03.07.2017Are the costs for the electricity house connection justified?10
21.02.2018Heating with electricity - infrared heating? Experiences wanted17
15.05.2018Water, gas, and electricity - disconnection and reconnection?10
17.02.2019Dimensioning of house connection electricity/gas/water11
28.06.2020Connection for network power supply very expensive?!23
07.03.2022How to connect an outdoor camera? LAN, power or battery25
04.06.2014How can one save electricity?21
13.02.2017With which heating system can I heat cheaply using electricity?11

Oben