What to do if the construction time is not met

  • Erstellt am 2017-01-20 08:58:26

Hoeffa

2017-01-20 21:02:51
  • #1
Since 31.12.2016 everything is available. According to the contract, the construction period starts one month after all necessary documents are available. Construction period 6 months - means it should be finished by August (plus bad weather days). In the last conversation, he also confirmed this again. And it is supposed to finally start at the beginning of February.
 

DNL

2017-01-21 00:30:26
  • #2
Is it even possible to make a floor slab at the current temperatures? I thought it should be above 0°
 

Iktinos

2017-01-21 00:47:01
  • #3
Fear? Have you ever heard that belief belongs to the responsibility of the churches?
 

Hoeffa

2017-01-21 06:58:01
  • #4
: Thank you for your constructive criticism, but that neither answers my original question nor helps anyone.
 

Hoeffa

2017-01-21 06:59:33
  • #5
It must not freeze. I also hope for a temperature rise in the next 2 weeks
 

ypg

2017-01-21 11:15:46
  • #6


So why not relaxed then?

If the contractor postpones the creation of the foundation slab further because of weather reasons, he is being careful with the construction project.
If it were my construction, I wouldn’t stress him or myself - no one benefits from that, especially not the house!

It really does not matter whether it is finished in August or September.
 

Similar topics
21.10.2011Floor slab insulation "Yes!" or "No!"14
18.09.2012Construction of a base slab with frost skirt but without foundation10
31.05.2015Wastewater pipe concreted in the floor slab at the wrong location29
14.09.2012House financing - house, garage, and foundation slab approx. 290,000 EUR11
26.10.2012External perimeter insulation floor slab, basement mold risk11
27.07.2013Average construction time for a semi-detached house with a basement11
21.11.2013Is the floor slab still possible this year?15
15.07.2014Foundation slab for Danwood bungalow? Company for complete works?11
23.11.2014Stone throw on foundation slab - builder's liability insurance?16
18.03.2015Developer information varies. What is the realistic construction time?19
15.06.2015Base slab or strip foundations for garage12
07.09.2015Minimum distance from the base plate?11
11.09.2016Base plate - construction/insulation etc. - experiences please!10
02.06.2016Necessary insurances during construction and afterwards11
05.08.2016Leave the floor slab over winter15
20.08.2016Base slab vs strip foundation15
13.09.2016Insulation under the floor slab EPS or XPS?12
29.07.2018Perimeter insulation under the floor slab and still XPS under the screed?28
09.07.2021Is the construction time specified in the prefabricated house contract binding?19
06.06.2023Estimation of construction time for the new build of a semi-detached house17

Oben