KMueller
2017-12-06 09:12:47
- #1
Hello!
We are planning the construction of a single-family house and have obtained offers for it. We also visited a civil engineer. He made 3 sketches. 2 were his ideas, the 3rd was a sketch from me, which he then "nicely" drew. Nothing else has taken place so far, not even a calculation. What costs should we approximately expect? We have not signed anything but had email correspondence regarding the designs and 2 conversations. Thank you very much for your help!
We are planning the construction of a single-family house and have obtained offers for it. We also visited a civil engineer. He made 3 sketches. 2 were his ideas, the 3rd was a sketch from me, which he then "nicely" drew. Nothing else has taken place so far, not even a calculation. What costs should we approximately expect? We have not signed anything but had email correspondence regarding the designs and 2 conversations. Thank you very much for your help!