Nikl043
2022-01-30 18:46:19
- #1
Hello everyone, in one month my ground floor in the old building will be plastered, but the plasterer has not yet done a wall heating (16 mm MVR on clamping rails on old brick wall). He would use a lime cement lightweight plaster (because of shrinkage behavior) but leaves the choice of material to me. It is 11 sqm in a bathroom, partially extending into the shower area. Therefore, no clay or pure lime, I think. It should be fully tiled afterwards. Does anyone have a recommendation for a suitable plaster, especially considering a quick processing time at 30 mm thickness? The whole thing is supposed to happen within a week, so a waiting time of 20 days after the first layer is somewhat unfavorable. Someone here on the forum once did this with Sakret MAP-L, but this is not available here. Therefore, I currently have Maxit Pluscalc 121, Maxit IP 18 or IP18 Ml, WeberDur 132, or possibly Super Lupp from Knauf in the selection. What would you take there?