KingRollo
2011-10-09 14:21:06
- #1
We have planned a walk-in shower from the beginning. For this purpose, the architect and structural engineer have planned a channel in the concrete ceiling, which the builder has accordingly shuttered. Now we have no problems with the installation of the drain including the slope to the ceiling penetration.