Vapor-tight connection of the exterior wall to the floor slab

  • Erstellt am 2024-02-04 18:35:03

Stephan—

2024-02-05 06:48:25
  • #1
PS: attaching the pot rail to the wall only after plastering would have looked cleaner/nicer, but that is already being overly meticulous.
 

parallelsym

2024-02-05 07:00:10
  • #2
It is about the foil in the wall. Ideally, the foil should be extended down to the base plate. In our case, the foil is basically folded down at the bottom, so that the wall is completely enclosed by the foil.

However, there are probably still a few scratches here and there from the installation of the brackets/anchors used to secure the walls.
 

jens.knoedel

2024-02-05 08:06:13
  • #3

What foil in the wall? What is the wall construction like? Prefabricated house?
 

Stephan—

2024-02-05 08:23:57
  • #4
Blocking layer foil after the first row of stones?! Wall structure or (schematic) drawing would be really good.
 

Similar topics
07.04.2015Wall construction of a country house25
02.06.2015The ideal wall structure in a solid house18
04.04.2016Prefabricated house - wall structure20
27.11.2018Evaluation of wall construction - steel frame prefab house11
02.10.2019Base plate - film against rising moisture15
14.02.2021Wall structure 36.5 Poroton T8 including clinker32
06.04.2021Best wall construction in the prefab house sector22
12.10.2023Mixed facade / Changeable facade wall structure15
31.01.2024Wall construction comparison Heinz von Heiden vs. Team Massivhaus16
15.05.2024Wall construction in solid construction method - experiences?25
18.01.2025Wall construction on lime-cement plaster (healthy for living / mineral)37

Oben