Hello,
we are getting a glued vinyl floor in our new building. (except bathroom)
Now the floor layers were here and left immediately because the
humidity was supposedly at 96%!!!???
A week before, the painter had finished his work (Thursday) and on Saturday
we taped the windows from the outside for the plaster. The following Thursday, the floor layers
were then here. The Sunday before, we heated for about 8 hours again because the field representative
of the floor layers' company said so. That probably wasn’t so great.
The screed was already very dry. Value 0.9 (I don’t know the unit)
Is it possible that after painting there is such a high humidity? There was no water condensation visible on the windows. Unfortunately, we only ventilated a little, through small openings in the windows.
After they left on Thursday, I cut out big holes and ventilated twice daily. The following Monday I then measured 40%. Is that possible?
I am at a loss.
Regards
we are getting a glued vinyl floor in our new building. (except bathroom)
Now the floor layers were here and left immediately because the
humidity was supposedly at 96%!!!???
A week before, the painter had finished his work (Thursday) and on Saturday
we taped the windows from the outside for the plaster. The following Thursday, the floor layers
were then here. The Sunday before, we heated for about 8 hours again because the field representative
of the floor layers' company said so. That probably wasn’t so great.
The screed was already very dry. Value 0.9 (I don’t know the unit)
Is it possible that after painting there is such a high humidity? There was no water condensation visible on the windows. Unfortunately, we only ventilated a little, through small openings in the windows.
After they left on Thursday, I cut out big holes and ventilated twice daily. The following Monday I then measured 40%. Is that possible?
I am at a loss.
Regards