Ttomtom79 2020-10-14 20:03:41#1With the developer, it is not your house. Only after handover. He can even remove you from the construction site.
With the developer, it is not your house. Only after handover. He can even remove you from the construction site.
TTarnari 2020-10-14 20:42:13#2 With the developer, it is not your house. Only after handover. He can even remove you from the construction site. Crazy... learned something new again. We had the first "key handover" yesterday, even if it was only for the garage side door ^^
With the developer, it is not your house. Only after handover. He can even remove you from the construction site. Crazy... learned something new again. We had the first "key handover" yesterday, even if it was only for the garage side door ^^
Iicandoit 2020-10-14 21:11:45#3Angular deviations of 6 mm / m are to be tolerated. Place the long spirit level and measure. If it is more than 6 mm at 1 m, report the defect in writing to the site manager.
Angular deviations of 6 mm / m are to be tolerated. Place the long spirit level and measure. If it is more than 6 mm at 1 m, report the defect in writing to the site manager.
HHausiKlausi 2020-10-15 23:11:19#4The problem is probably the "rounded corners", which make a horizontal joint more challenging. There's not much you can do with tile spacers.
The problem is probably the "rounded corners", which make a horizontal joint more challenging. There's not much you can do with tile spacers.